A containerized 600 kWh marine battery system will be installed in a trial on board the Maersk Cape Town in December 2019 to improve vessel performance and reliability while reducing CO2 emissions.

“This trial will provide a greater understanding of energy storage that will support Maersk in moving towards further electrification of its fleet and port terminals. Maersk will continue to facilitate, test, and develop low-carbon solutions on our journey to become carbon neutral by 2050,” explains Søren Toft, Maersk COO.

Propelling marine vessels with battery power alone is still years away from being a technically- and economically viable option. However marine battery systems can be used to improve the efficiency of a vessel’s onboard electrical systems such as the Maersk Cape Town’s generators. By maintaining the vessel’s auxiliary generators at a more optimal load, and avoiding running generators when not needed, overall fuel consumption can be reduced.

Additionally, it will support the generators with up to 1,800 kVA of power during rapid changes in electrical load such as thruster operation. This can reduce generator maintenance requirements. The battery system is also capable of providing redundant power, which can improve reliability at sea by ensuring continuous power supply.

The Maersk Cape Town includes a waste heat recovery system, which is a special feature of many Maersk container vessels. This system increases overall efficiency, as it allows the batteries to charge by capturing electrical energy from heat that would otherwise have been lost out of the exhaust gas system for the main propulsion.

“This exciting pilot – the first of its kind in the industry - will show the potential of battery technologies to keep improving the performance of our vessels while also reducing fuel consumption in our non-propulsion electrical systems,” reinforces Ole Graa, Maersk Head of Fleet Technology.

The containerized battery energy storage system has been manufactured in Odense, Denmark by the system integrator and turnkey supplier Trident Maritime Systems. The battery system will be shortly transported to Singapore and installed on board the Maersk Cape Town.

The vessel is a Singapore-flagged 249-meter long container ship built in 2011 which sails between West Africa and East Asia. The first full voyage with the new system in place will take place next year and will be closely monitored to evaluate the performance of the system against the trial’s ambitions.

Battery modules will be operating within the container in conjunction with other electrical and control components. Maersk has also worked in close collaboration with the American Bureau of Shipping - the vessel’s classification society – to ensure safety and compliance.

The application of battery technology and the understandings gained can enable further innovation across A.P.Moller- Maersk. We have an interest in working with suppliers to grow these possibilities as the technology matures.

Contact details Concepción Boo Arias, concepcionboo.arias@maersk.com +45 24495026

About Maersk

A.P. Moller - Maersk is an integrated container logistics company working to connect and simplify its customers’supply chains. As the global leader in shipping services, the company operates in 130 countries and employs roughly 76,000 people.

Press Contact:

无论您需要什么,我们都可以随时为您提供帮助

解决方案

解决方案

我们满足从供应链一端到另一端的客户需求。
联系我们

联系我们

我们的专家团队随时为您服务。
查询价格

准备好运送货物?

查询航运及内陆运输费率。
关注最新动态
注册订阅马士基新闻与洞察
收取直接发送至您收件箱的有关供应链趋势的宝贵信息,在业内保持一路领先

提交此表,即表示我同意通过电子邮件接收 A. P. 穆勒-马士基集团及其关联公司接收物流相关新闻和营销信息更新。我了解我可以随时通过点击退订链接,取消接收此类马士基推送信息。如需查看我们会如何处理您的个人信息,请查阅隐私公告

感谢您注册
您现在已经注册接收新闻通讯。您很快将收到一封电子邮件,其中将说明如何对该新闻通讯进行偏好设置。
已订阅
您可以随时取消订阅。