
Shipping to and from Curacao
Your complete guide to shipping to and from Curacao. Find the right route, get Maersk office locations, discover local solutions, payment options and more.
İthalat
İthalat prosedürleri ve kısıtlamaları, demuraj ve detention, konteyner teslim etme işlemleri ve daha fazlası hakkında güncel yerel bilgiler alın.
Demurrage and detention
Procedures
Standard free time - Import
Port / terminal Names : All Ports
Valid from : 1st December 2019
Charge type : Demurrage and Detention combined
Transport mode : All transport modes
Service mode : All service modes
Container type | Free time(Days) | Calendar / Working | Same / Next day if after |
---|---|---|---|
Container type
DRY
|
Free time(Days)
11
|
Calendar / Working
Calendar
|
Same / Next day if after
Same_Day
|
Container type
REEF
|
Free time(Days)
5
|
Calendar / Working
Calendar
|
Same / Next day if after
Same_Day
|
Container type
IMO
|
Free time(Days)
7
|
Calendar / Working
Calendar
|
Same / Next day if after
Same_Day
|
Container type
OTHER
|
Free time(Days)
5
|
Calendar / Working
Calendar
|
Same / Next day if after
Same_Day
|
Standard rates applicable after free time*
Tier | Days | Rate for 20 DRY | Rate for 40/45 DRY |
---|---|---|---|
Tier
Tier 1
|
Days
12 - 18
|
Rate for 20 DRY
75 USD
|
Rate for 40/45 DRY
75 USD
|
Tier
Tier 2
|
Days
19+
|
Rate for 20 DRY
100 USD
|
Rate for 40/45 DRY
100 USD
|
Tier | Days | Rate for 20 REEF | Rate for 40 REEF | Rate for 20' Flat & Open Top | Rate for 40' Flat & Open Top |
---|---|---|---|---|---|
Tier
Tier 1
|
Days
6 - 12
|
Rate for 20 REEF
120 USD
|
Rate for 40 REEF
120 USD
|
Rate for 20' Flat & Open Top
120 USD
|
Rate for 40' Flat & Open Top
120 USD
|
Tier
Tier 2
|
Days
13+
|
Rate for 20 REEF
150 USD
|
Rate for 40 REEF
150 USD
|
Rate for 20' Flat & Open Top
150 USD
|
Rate for 40' Flat & Open Top
150 USD
|
Tier | Days | IMO 20' | IMO 40' |
---|---|---|---|
Tier
Tier 1
|
Days
8 - 12 days
|
IMO 20'
120 USD
|
IMO 40'
120 USD
|
Tier
Tier 2
|
Days
13+
|
IMO 20'
150 USD
|
IMO 40'
150 USD
|
- General Demurrage & Detention Information.
Import Demurrage and Detention
- Free time, demurrage, and detention terms apply to the country where the Empty unit is gated-in by the customer or at the location designated by the carrier.
- Demurrage & Detention combined | from gate in Full at terminal/depot to gate in Empty return at terminal/depot.
- Charges in USD per calendar day (including weekends and holidays).
- Maersk uses a Progressive method to calculate demurrage and detention charges after the free time expires. For customers with special agreements, exceeding the extended free time will incur demurrage and detention charges based on the relevant day count within our tiered tariff structure. This means that subsequent charges beyond the extended free time will not automatically be calculated using the first-tier rates. Discharge Date is considered the starting point for calculating demurrage and detention combined.
- Free Time.
- Intermodal Free Time: Free time conditions are the same for both Carrier and Merchant Haulage. The Free Time period begins on the discharge date of the full unit and ends upon the gate-in of the empty unit to the terminal or depot assigned by the carrier.
- Hazardous cargo receives the same free time conditions as dry units. However, responsibility for the handling and storage of hazardous cargo at terminals and depots remains with the cargo owners.
- Non-Operating Reefer (NOR): DRY equipment (40DRY includes 8'6 & 9'6) free days and per diem conditions applies to NORs. NOR with Hazardous Cargo will be treat as DRY
- Equipment Types.
- Dry Equipment refers to 20-foot Dry, 40-foot Dry, 40-foot High-Cube, 45-foot Dry, and Reefer units (20'RF, 40'RF, and 40'RH). Special equipment includes Open Tops, Flat Racks, and Out-of-Gauge cargo. SOC Equipment refers to equipment owned by the merchant/shipper. COC refers to equipment owned by the carrier.
- Shipper-owned containers (SOC) are not subject to detention but are subject to storage and demurrage charges.
- Special Conditions.
- Spot conditions may differ from the conditions mentioned above. Maersk Spot (instant booking system) conditions are available in the downloadable document provided Here, which supersedes any separately agreed-upon terms. If you have any doubts, please check with the shipper or your local agents to confirm the booking/shipment modality you used. Link to downloadable document.
- Demurrage and Detention charge applied to any given shipment depends to the PCD: Price Calculation Date (PCD). The following factors should be considered as guidance.
- PCD for non-FMC shipments – The date when the carrying vessel is scheduled to depart from the Port of Loading.
- PCD for FMC regulated trades – The date when Maersk Line takes possession of the last container listed on the transport document. This affects the Demurrage and Detention special free time. You will need to negotiate and mutually agree on the specifics before or on the Price Calculation Date.
- Other Important Information.
- D&D Calculator Click here to know more about it
- Terminal storage charges may apply, nevertheless, those are charged directly by Terminal Operator.
- Terminal plug-in and electricity charges may apply; however, these charges are billed directly by the Terminal Operator.
- The Shipper assumes, prior to the shipowner, the contractual and legal duty to export/ship their cargo to a Consignee who has a genuine interest and the necessary conditions to acquire/receive the imported cargo. The Shipper is responsible for promoting the effective removal of the cargo at the destination and fulfilling all obligations associated with this act. If the cargo is abandoned at its destination or if the Consignee fails to remove it for any reason, the Shipper shall be jointly and severally liable, together with the Consignee, for all amounts, costs, expenses, damages, or losses incurred by the carrier as a result of this situation.
Country | City | Service | Vessel arrival | Departure |
---|---|---|---|---|
Country
Aruba
|
City
Oranjestad
|
Service
Calypso feeder
|
Vessel arrival
Thursday 08:00
|
Departure
Thursday 16:00
|
Country
Curacao
|
City
Willemstad
|
Service
Curacao feeder
|
Vessel arrival
Tuesday 09:00
|
Departure
Tuesday 23:00
|
Mandatory for Customs
All shipper own shipments / containers must be declared in the description.
No radioactive material are accepted.
- Documentation cut-off : 48 hours before vessel arrival.
- Equipment cut-off : 24 hours before vessel arrival.
News in Latin America
TÜM HABERLERİ GÖRÜNTÜLEİhtiyacınız duyduğunuz her alanda yardıma hazırız
Yüklemeye hazır mısınız?
Yeni yüklemeler için navlun ve iç taşıma fiyatı arayın.
Satış sorguları
Bizimle iletişim kurun; size sonraki iki iş günü içinde yanıt vereceğiz.